Sutter Medical Center Expansion
Below are the planning documents currently available for thet Sutter Medical Center expansion project.
Environmental Impact Reports (EIRs)
Draft EIR
Revised EIR
- Revised EIR (PDF - 26 MB)
Final EIR
- Cover / Title Page / Table of Contents (PDF - 11 MB)
- Introduction (PDF - 32 KB)
- Text Changes (PDF - 74 KB)
- Revised Construction Schedule (PDF - 56 KB)
- List of Commentors (PDF - 10 KB)
- Responses (PDF - 326 KB)
- Migration Monitoring Plan (PDF - 13 KB)
- Table - Migration Plan for Sutter (PDF - 112 KB)
- Table - Migration Plan for Trinity Church (PDF - 52 KB)
- Appendix A (PDF - 166 KB)
- Figures
- Figure 1 - Elevation Perspective (PDF - 380 KB)
- Figure 2 - SMCS Plan View (PDF - 4 MB)
- Figure 2.26 - Rendering of the Proposed Trinity Cathedral (PDF - 9 MB)
