Richards Boulevard Project Area
picture of theater
Downtown Project Area
 
 

 

Hotel & Residential (return to Downtown Project Area Map)

Projects Underway:

Ping Yuen
Plaza Lofts
18th and L

Upcoming Projects:

Capitol Lofts
East End Gateway
Capitol Terrace, 21st and L
Fremont Mews

Completed Projects:

Embassy Suites Hotel
10th and T
Capitol Park Homes
6th and S
Fremont Building
Sheraton Grand Sacramento
Twin Palms
4th and T
1500 Q Street
13th and F
Metro Square
Pensione K
Maria Hastings Renovation
Hyatt Hotel


PROJECTS UNDERWAY:

Ping Yuen (click to view photo)
Project Description: As part of a revitalization effort of the historic Chinatown block, a vacant structure will be rehabilitated for 82 affordable senior apartments and community space. The project includes 1,200 sf of retail.
Total Project Cost: $10.2 million
Under Contruction
Anticipated Completion Date: Winter 2004

(back to top)

Plaza Lofts, 9th & J Streets (click to view photo)
Project Description: Hollywood-based CIM Group's design consists of a 7-story, concrete-framed mixed-use project with 200 -270 residential units above 17,000 square feet of ground floor retail. Parking for residents and retail tenants will be provided on the sub-grade level and on two levels above the ground floor. Ground floor retail will be available along 8th, 9th and J Streets.
Estimated Project Cost: $43 million
Under construction
Anticipated Completion Date: Winter 2005

(back to top)

18th and L (click to view photo)
Project Description: Construction of 176 rental apartments and live/work lofts with 9,600 sf of ground floor retail space, located on both the north and south sides of L Street between 18th and 19th streets.
Total Project Cost: $25.5 million
Under Construction
Anticipated Completion Date: Summer 2005

(back to top)

 

UPCOMING PROJECTS:

Capitol Lofts (formerly CADA Warehouse) (click to view photo)
Project Description: The site consists of a six-story historic warehouse building, historic three-story office/warehouse building, one-story warehouse, and surface parking located on the south side of R Street between 11th and 12th streets. The development as proposed consists of 102 one, two and three-bedroom loft and live/work units which will be offered for sale. Visit www.cadanet.org for more information.
Total Project Cost: $15 million
(back to top)

East End Gateway
On June 27, 2003, the Capitol Area Development Authority (CADA) selected two development teams to design and develop four key residential sites along 16th Street between N and P Streets, near the State's East End Office Project. Visit www.cadanet.org for more information.
(back to top)

Capitol Terrace, 21st and L
Project Description: Construction of 65 multi-family rental units with 3,300 sf of retail space located at the southeast corner of 21st and L Streets.
(back to top)

Fremont Mews
The development is to be located on CADA Site 13, the four fifths of the block between 14th and 15th, P and Q Streets. The project site is currently occupied by the Ron Mandella Community Garden and a state managed parking lot. The Fremont Mews includes a total of 119 residential units and 19,200 S.F. of community garden space. Visit www.cadanet.org for more information.
(back to top)

 

COMPLETED PROJECTS:

Embassy Suites Hotel (click to view photo)
Project Description: An 8-story, 248-room full-service hotel to be operated by Embassy Suites. Project also includes underground valet parking, meeting space, outdoor terrace dining and an indoor restaurant.
Total Project Cost: $35 million
Date of Completion: April 2002
(back to top)

10th and T (click to view photo)
Project Description: Construction of 12 ownership units and one live/work unit located at the NW corner of 10th and T streets.
Total Project Cost: $2.3 million
Date of Completion: 2002
(back to top)

Capitol Park Homes
Project Description: Construction of 64 single-family ownership homes in Capitol Park on the block bound by 12th and 14th streets and P and Q streets.
Total Project Cost: $13.3 million
Date of Completion: Summer 2002
(back to top)

Keystone Development, 6th and S
Project Description: Construction of 5 ownership homes in the Southside neighborhood at 6th and S Streets.
Total Project Cost: $796,000
Date of Completion: 2000

Fremont Building (click to view photo)
Project Description: Construction of 69 rental apartments with 12,000 sf of ground floor retail located in the Fremont Park neighborhood at 16th between O and P streets.
Total Project Cost: $9.8 million
Date of Completion: July 2001
(back to top)

Sheraton Grand Sacramento (click to view photo)
Project Description: Construction of a 28-story, 500-room convention center hotel operated by Starwood Hotels and Resorts, Inc. The project preserves the historic public market building, originally designed in 1923 by Julia Morgan, by housing the hotel's ballroom, two restaurants, and meeting space. The project also includes a business center, fitness facilities, valet parking, and car rental services.
Total Project Cost: $90 million
Date of Completion: April 2001
(back to top)

Twin Palms (click to view photo)
Project Description: Construction of 5 market rate townhouse condominiums located in the Southside neighborhood at the SW corner of 6th and S streets.
Total Project Cost: $1 million
Date of Completion: March 2000
(back to top)

4th and T (click to view photo)
Project Description: Construction of 3 single-family ownership homes plus 3 second units in the Southside neighborhood located at the NE corner of 4th and T streets.
Total Project Cost: $476,000
Date of Completion: Spring 2000
(back to top)

1500 Q Street (click to view photo)
Project Description: Historic preservation and construction of 6 rental units w/ground floor retail.
Total Project Cost: $870,000
Date of Completion: December 2000
(back to top)

13th and F (click to view photo)
Project Description: Construction of 10 single-family ownership homes located in the Alkali Flat neighborhood at the SW corner of 13th and F streets.
Total Project Cost: $1.7 million
Date of Completion: June 2000
(back to top)

Metro Square (click to view photo)
Project Description: Development of one city square block consisting of 54 single-family, detached market-rate homes. All homes were pre-sold within the first few weeks of opening.
Total Project Cost: $6.7 million
Date of Completion: 1998
(back to top)

Pensione K (click to view photo)
Project Description: Construction of a 7-story building consisting of 129 units & 8 artist live/work units plus ground floor retail.
Total Project Cost: $4.9 million
Date of Completion: 1995
(back to top)

Maria Hastings Renovation
Project Description: Renovation of historic Maria Hastings Building completed in conjunction with US Bank building development.
Total Project Cost: $500,000
Date of Completion: 1992
(back to top)

Hyatt Hotel (click to view photo)
Project Description: Construction of a 500-room, full-service hotel with ground floor retail to service Downtown and the Convention Center.
Total Project Cost: $54 million
Date of Completion: 1988
(back to top)