PROJECTS UNDERWAY:
Ping Yuen (click
to view photo)
Project Description: As part of a revitalization effort of the historic
Chinatown block, a vacant structure will be rehabilitated for 82 affordable
senior apartments and community space. The project includes 1,200 sf of
retail.
Total Project Cost: $10.2 million
Under Contruction
Anticipated Completion Date: Winter 2004
(back to top)
Plaza Lofts, 9th & J Streets
(click
to view photo)
Project Description: Hollywood-based CIM Group's design consists of a
7-story, concrete-framed mixed-use project with 200 -270 residential units
above 17,000 square feet of ground floor retail. Parking for residents
and retail tenants will be provided on the sub-grade level and on two
levels above the ground floor. Ground floor retail will be available along
8th, 9th and J Streets.
Estimated Project Cost: $43 million
Under construction
Anticipated Completion Date: Winter 2005
(back to top)
18th and L
(click to view photo)
Project Description: Construction of 176 rental apartments and live/work
lofts with 9,600 sf of ground floor retail space, located on both the
north and south sides of L Street between 18th and 19th streets.
Total Project Cost: $25.5 million
Under Construction
Anticipated Completion Date: Summer 2005
(back to top)
UPCOMING PROJECTS:
Capitol Lofts (formerly CADA Warehouse)
(click to view photo)
Project Description: The site consists of a six-story historic warehouse
building, historic three-story office/warehouse building, one-story warehouse,
and surface parking located on the south side of R Street between 11th
and 12th streets. The development as proposed consists of 102 one, two
and three-bedroom loft and live/work units which will be offered for sale.
Visit www.cadanet.org
for more information.
Total Project Cost: $15 million
(back to top)
East End Gateway
On June 27, 2003, the Capitol Area Development Authority (CADA) selected
two development teams to design and develop four key residential sites
along 16th Street between N and P Streets, near the State's East End Office
Project. Visit www.cadanet.org
for more information.
(back to top)
Capitol Terrace, 21st and L
Project Description: Construction of 65 multi-family rental units with
3,300 sf of retail space located at the southeast corner of 21st and L
Streets.
(back to top)
Fremont Mews
The development is to be located on CADA Site 13, the four fifths of the
block between 14th and 15th, P and Q Streets. The project site is currently
occupied by the Ron Mandella Community Garden and a state managed parking
lot. The Fremont Mews includes a total of 119 residential units and 19,200
S.F. of community garden space. Visit www.cadanet.org
for more information.
(back to top)
COMPLETED PROJECTS:
Embassy Suites Hotel
(click to view photo)
Project Description: An 8-story, 248-room full-service hotel to be operated
by Embassy Suites. Project also includes underground valet parking, meeting
space, outdoor terrace dining and an indoor restaurant.
Total Project Cost: $35 million
Date of Completion: April 2002
(back to top)
10th and T
(click to view photo)
Project Description: Construction of 12 ownership units and one live/work
unit located at the NW corner of 10th and T streets.
Total Project Cost: $2.3 million
Date of Completion: 2002
(back to top)
Capitol Park Homes
Project Description: Construction of 64 single-family ownership homes
in Capitol Park on the block bound by 12th and 14th streets and P and
Q streets.
Total Project Cost: $13.3 million
Date of Completion: Summer 2002
(back to top)
Keystone Development, 6th and S
Project Description: Construction of 5 ownership homes in the Southside
neighborhood at 6th and S Streets.
Total Project Cost: $796,000
Date of Completion: 2000
Fremont Building
(click to view photo)
Project Description: Construction of 69 rental apartments with 12,000
sf of ground floor retail located in the Fremont Park neighborhood at
16th between O and P streets.
Total Project Cost: $9.8 million
Date of Completion: July 2001
(back to top)
Sheraton Grand Sacramento
(click to view photo)
Project Description: Construction of a 28-story, 500-room convention center
hotel operated by Starwood Hotels and Resorts, Inc. The project preserves
the historic public market building, originally designed in 1923 by Julia
Morgan, by housing the hotel's ballroom, two restaurants, and meeting
space. The project also includes a business center, fitness facilities,
valet parking, and car rental services.
Total Project Cost: $90 million
Date of Completion: April 2001
(back to top)
Twin Palms
(click to view photo)
Project Description: Construction of 5 market rate townhouse condominiums
located in the Southside neighborhood at the SW corner of 6th and S streets.
Total Project Cost: $1 million
Date of Completion: March 2000
(back to top)
4th and T
(click to view photo)
Project Description: Construction of 3 single-family ownership homes plus
3 second units in the Southside neighborhood located at the NE corner
of 4th and T streets.
Total Project Cost: $476,000
Date of Completion: Spring 2000
(back to top)
1500 Q Street
(click to view photo)
Project Description: Historic preservation and construction of 6 rental
units w/ground floor retail.
Total Project Cost: $870,000
Date of Completion: December 2000
(back to top)
13th and F
(click to view photo)
Project Description: Construction of 10 single-family ownership homes
located in the Alkali Flat neighborhood at the SW corner of 13th and F
streets.
Total Project Cost: $1.7 million
Date of Completion: June 2000
(back to top)
Metro Square
(click to view photo)
Project Description: Development of one city square block consisting of
54 single-family, detached market-rate homes. All homes were pre-sold
within the first few weeks of opening.
Total Project Cost: $6.7 million
Date of Completion: 1998
(back to top)
Pensione K
(click to view photo)
Project Description: Construction of a 7-story building consisting of
129 units & 8 artist live/work units plus ground floor retail.
Total Project Cost: $4.9 million
Date of Completion: 1995
(back to top)
Maria Hastings Renovation
Project Description: Renovation of historic Maria Hastings Building completed
in conjunction with US Bank building development.
Total Project Cost: $500,000
Date of Completion: 1992
(back to top)
Hyatt Hotel
(click to view photo)
Project Description: Construction of a 500-room, full-service hotel with
ground floor retail to service Downtown and the Convention Center.
Total Project Cost: $54 million
Date of Completion: 1988
(back to top)
|