Project |
Date |
|
|
Project |
Manager |
Opened |
Bid Responses |
Bid Amount |
| |
|
|
|
|
Tasers Bid
(B081351025)
(1 Bid Received)
|
James A (Jim) Primrose |
05-01-2008 |
Tasers International |
$89,108.79 |
| |
|
|
|
|
2008 City Street Overlay
(R15072010)
(8 Bids Received) |
Zuhair Amawi |
04-30-2008 |
J.A. Gonsalves & Son
Martin Brothers Const.
Granite Const. Co.
General Engineering Inc.
Martin General |
$668,843.50
$673.997.00
$683,295.00
$688,765.00
$689,147.00 |
| |
|
|
|
|
Glenbrook Dog Park (BO84727024)
(10 Bids Received)
|
Dennis Day
|
04-30-2008 |
MIB Enterprises
Biundo Landscape
Bonatecia Engineering
Parker Landscape Dev.
Solo Landscaping
|
$55,600.00
$55,975.00
$58,500.00
$58,835.40
$59,201.60 |
| |
|
|
|
|
2008 Speed Humps Project
(S15071200)
(12 Bids Received) |
Ed Williams |
04-30-2008 |
Central Valley
Central Pacific Const
Valley Slurry Seal Co
Florez Paving
Biondi Paving |
$134,587.00
$143,811.55
$146,441.00
$147,073.00
$150,396.00 |
| |
|
|
|
|
Steve Jones Park (B084727020)
(13 Bids Received) |
Jeff Nittka |
04-23-2008 |
Adland Venture Lndscp
Parker Landscape Dev
Valleycrest Landscape
JM Slover Inc.
Hemington Landscape |
$365,326.23
$369,946.20
$374,766.00
$384,310.00
$384,677.00 |
| |
|
|
|
|
McKinley Park Irrigation Improvements (B084727022)
(6 Bids Received) |
Dennis Day |
04-23-2008 |
Saenz Landscape
Ad Land Venture Lndsp
Gateway Landscape
Parker Landscape Dev.
Gold Valley Construction |
$174,920.00
$196,277.23
$197,000.00
$203,649.00
$232,630.00
|
| |
|
|
|
|
11th Street Sewer Replacement - O/P Alley to R Street (B083331020)
(2 Bids Received) |
Michelle Carrey |
04-16-2008 |
Navajo Pipelines
Delta Excavating |
$364,915.00
$430,672.00
|
| |
|
|
|
|
South Natomas Community Center Concession (B083282018)
(7 Bids Received) |
Suzy Vose |
04-16-2008 |
Melnikou Const.
Treehenge Const.
Hometown Const.
Sls Constructors, Inc.
Ivie Const.
|
$99,900.00
$104,000.00
$121,000.00
$121,000.00
$124,000.00
|
| |
|
|
|
|
2008 Seal Coat Project (B083431021)
(5 Bids Received) |
Greg Smith |
04-16-2008 |
Bond Blacktop
VSS Valley Slurry Seal
CPM Calif. Paving Maint.
Graham Contractors Inc
Intermountain |
$3.847,800.60
$4,299,624.46
$4,550,937.51
$5,134,527.97
$5,705,719.93
|
| |
|
|
|
|
Workers' Compensation Cost Containment Services - Bill Review, Utilization Review, Nurse Case Mgmt (P081542001)
(...Bids Received) |
Patrick Flaherty |
04-11-2008 |
Not Yet Available |
|
| |
|
|
|
|
Underwater Dive and ROV Services Proposal (P083321019)
(...Proposals Received) |
Craig Chalmers |
04-10-2008 |
Above and Below
Potable Water Divers
Advanced Diving Serv.
Tidal Marine Const.
|
|
| |
|
|
|
|
Collapsing/Demolition of Immediately Dangerous Building Services (B081181059)
(4 Bids Received) |
Ron O'Connor |
04-09-2008 |
Fuller Excavating & Demo.
Advantage Demo & Eng.
GW Demolition
Evans Brothers |
$98.33/116.67
$578.00/1,170.00
$633.33/950.00
$2,000.00/4,000.00 |
| |
|
|
|
|
Trash and Debris Abatement Services (B081181061)
(7 Bids Received)
|
Ron O'Connor |
04-09-2008 |
NCRM
Clean Sweep Environ.
Zero Waste Solutions
IMS Facility Maint.
JFD Enterprises
|
$29.00
$77.00
$85.00
$108.00
$175.00 |
| |
|
|
|
|
On-Call Building Securement Services (B081181060)
(4 Bids Received) |
Ron O'Connor |
04-09-2008 |
B-Line Construction
Vacant Property Sec.
Gray Const. & Sec. Svcs
Capitol Recon. Co. |
$84.40/608.00
$85.00/125.00
$360.00/608.00
$385.00/613.50 |
| |
|
|
|
|
Coloma Community Center Fire Alarm Upgrade (B083282019)
(3 Bids Received) |
Brian Reilly
|
04-09-2008 |
Simplex Grinnell
PBM Construction
Cosco Fire Protection |
$155,000.00
$187,500.00
$350,850.00 |
| |
|
|
|
|
Bile Lane Improvements Project (B083231020)
(... Bids Received) |
Salam Shehadeh
|
04-08-2008 |
Not Yet Available |
|
| |
|
|
|
|
Sedans (B083259021)
(... Bids Received) |
Bill Tierce |
04-04-2008 |
Not Yet Available |
|
| |
|
|
|
|
Automotive Emissions Testing and repair (B083259023)
(...Bids Received) |
Rowie Sizemore
|
04-03-2008 |
Not Yet Available |
|
| |
|
|
|
|
Rental of Aerial Lift Trucks
(B0823259022)
(...Bids Received) |
Bill Tierce |
04-03-2008 |
Not Yet Available |
|
| |
|
|
|
|
Marriott Park Improvements (LU47) (B084727021)
(10 Bids Received) |
Tin-Wah Wong |
04-02-2008 |
Saenz Lndscp.Const.
Gold Valley Const.
Parker Lndscp. Dev. Inc.
Gateway Lndscp.
Community Playground
.
|
$ 70,052.00
$ 79,906.00
$ 80,977.00
$ 82,000.00
$ 83,958.00 |
| |
|
|
|
|
West El Camino/Interstate 80 Interchange Signalization
(P083431007) (...Proposals Received)
|
Matthew Johns |
04-01-2008 |
Not Yet Available |
|
| |
|
|
|
|
EA Fairbairn Water Treatment Plant Old Filter Gallery and Old Operations Bldg. (B083351017)
(1 Bid Received)
|
Craig Chalmers |
04-01-2008 |
Sholl Construction Co. |
$16,500.00 |
| |
|
|
|
|
Del Paso Road/Interstate 5
Interchange Signalization
(P083431008)
(... Proposals Received) |
Cecilyn Foote |
04-01-2008 |
Not Yet Available |
|
| |
|
|
|
|
Midtown Water Meter Retrofit - 2008 (ZS10) (B083331019)
(... Bids Received) |
Chris Powell |
03-26-2008 |
Preston Pipelines
Florez Paving
Vulcan Const. & Maint.
Navajo Pipelines Inc.
Teichert Construction |
$623,397.00
$683,000.00
$687,450.00
$690,100.00
$727,485.00 |
| |
|
|
|
|
Dixeanne Street Lighting Phase III (B083431019)
(14 Bids Received) |
John Matoba |
03-26-2008 |
Dynaram Construction
M&M Electric
Moreno Trenching Ltd.
Pacific Excavation
Norwood Construction |
$386,706.00
$454,977.00
$459,668.00
$461,600.00
$465,050.00 |
| |
|
|
|
|
Water Meter Reading Automation System (B081312006)
(... Bids Received) |
Thanh Vo |
03-26-2008 |
Not Yet Available |
|
| |
|
|
|
|
Sewer Rodder Bodies (B081181055)
(2. Bids Received) |
Marc Robles |
03-26-2008 |
Weco Industries
MME |
$118,522.85
$56,952.39 |
| |
|
|
|
|
Hydraulic Equipment Repairs and Replacement (B081181057)
(2 Bids Received) |
Marc Robles |
03-26-2008 |
Berendsen F.P. |
$250,769.11 |
| |
|
|
|
|
| Printing and Mailing Services - 2008 218 Rate Notification
(P083351018) (8 Proposals Received)
|
Jessica Hess |
03-20-2008 |
American Lithographers
SIA Professional Svcs
Commerce Printing Svcs
National Data Svcs, Inc.
Techcolor Graphics, Inc.
The Data Center
Alonzo Printing, People, Planet
|
|
| |
|
|
|
|
NEMA Traffic Controller Cabinets, Typ "R" (B081181056)
(1 Bids Received) |
Rachel Rosas |
03-19-2008 |
Mccain Traffic Supply |
$424,776.36 |
| |
|
|
|
|
Swimming Pool Equipment and Supplies (B084734001)
(3 Bids Received) |
Gregory Narramore |
03-19-2008 |
Knorr Systems
Lincoln Equipment CO
Aqua Tech Systems, Inc |
See Bid Eval |
| |
|
|
|
|
Arbitrage Calculation Services (P080900002)
(... Proposals Received) |
Janelle Gray |
03-14-2008 |
Not Yet Available |
|
| |
|
|
|
|
Fire Station 56 Generator (B083275008)
(7 Bids Received) |
James Christensen |
03-12-2008 |
Johnson Mechanical
SLS Constructors
Paul Kearney
R-E Corp.
TS Green Const. |
$119,114.00
$123,000.00
$127,500.00
$133,489.00
$134,483.00 |
| |
|
|
|
|
Ben Ali Street Lighting (B083431018)
(16 Bids Received) |
Kaleb Haile |
03-12-2008 |
M&M Electric
Pacific Excavation
Moreno Trenching Ltd.
Gray Electric
Dynaram Const.
|
$319,877.00
$323,349.00
$327,876.00
$348,339.00
$349,219.00 |
| |
|
|
|
|
NEMA Traffic Controller Cabinets (B083496003)
(2 Bids Received) |
Rachel Rosas |
03-11-2008 |
Jam Services
Traffic Parts, Inc. |
$54,500.00
$74,100.00
See Bid Eval |
| |
|
|
|
|
Sign Blanks (B083495004)
(7 Bids Received) |
Rachel Rosas |
03-11-2008 |
Osborn Assoc., Inc.
Zumar Industries, Inc.
Rocal Inc.
Zap Manuf. Inc.
Custom Products
|
$10,340.25
$11,157.50
$11,654.50
$12,800.00
$13,601.25
See Bid Eval |
| |
|
|
|
|
VWware software purchase (B081341007)
(10 Bids Received) |
Jack Wines |
03-07-2008 |
AccessFlow
En Pointe Tech.
Western Blue
Peak IP Solutions, LLC
Zones |
$82,590.00
$93,654.81
$94,047.01
$96,378.85
$96,831.36
See Bid Eval |
| |
|
|
|
|
Sump 65 Pump Station Electrical Improvements
(B083331018)
(4 Bids Received) |
Jian Zhuang |
03-05-2008 |
JR Sharp Construction
Interstate Construction
Johnson Mechanical Co.
Division 515 |
$175,000.00
$194,800.00
$246,722.00
$252,338.00
|
| |
|
|
|
|
Shasta Community Park-Phase 1 (B084727019)
(12 Bids Received) |
Dennis Day |
03-05-2008 |
P.B.M. Construction
Adland Venture
Hemington Landscape
Gold Valley Constr
Parker Landscape |
$2,552,696.00
$2,589,970.00
$2,632,025.00
$2,662,165.00
$2,684,157.00
|
| |
|
|
|
|
North Natomas Library
(B083282016)
(9 Bids Received) |
Terry Grayson |
03-05-2008 |
McCarthy Construction
Bobo Construction
SW Allen Construction
C&C Construction
Mascon Inc. |
$6,998,000.00
$7,250,000.00
$7,341,597.00
$7,352,161.00
$7,393,000.00 |
| |
|
|
|
|
Del Paso-Grove Street Lighting (B03431017)
(9 Bids Received) |
Kaleb Haile |
03-05-2008 |
Moreno Trenching LTD
Pacific Excavating
Emard Electric
M&M Electric
Richard A. Heaps |
$1,127,807.00
$1,326,850.00
$1,330.000.00
$1,358.777.00
$1,466.761.00 |
| |
|
|
|
|
Varian GC/MS/MS Refubish & Upgrade (B083327015)
(1 Bids Received) |
Roland Pang |
02-28-2008 |
Varian Inc. |
$37,304.00 |
| |
|
|
|
|
Howe Avenue Bridge Over American River Rehabilitation Project (B083431015)
(3 Bids Received) |
Ricky Chuck |
02-27-2008 |
R.A. Nemetz Const. Co.
CM Long
George Bianchi Const. |
$165,616.00
$174,800.00
$214,535.55 |
| |
|
|
|
|
Oak Park Center Phase II (B083282015)
(13 Bids Received) |
Suzy Vose |
02-27-2008 |
Cornerstone Plaster Dev
John F. Otto
C&C Const.
LM Combs Const.
Waters Contracting
|
$52,630.00
$2,335,000.00
$2,429,750.00
$2,488,874.00
$2,525,000.00
See Bid Eval |
| |
|
|
|
|
Boom Trucks (Aerial Mounted Devices) (B081181049)
(2 Bids Received) |
Christine Slay |
02-27-2008 |
Terex Utilities
Altec Industries |
$291,929.23
$310,891.00 |
| |
|
|
|
|
Development of COOP/COG Plan (Q080310002)
(... Quotes Received) |
Mark Prestwich |
02-26-2008 |
Not Yet Available |
|
| |
|
|
|
|
Stockton & Dias Traffic Signal (B083431016)
(... Bids Received) |
|
02-26-2008 |
Not Yet Available |
|
| |
|
|
|
|
Aluminum Sheets (B083495002)
(7 Bids Received) |
Rachel Rosas |
02-25-2008 |
U.S. Standard Sign Co.
Gerlinger Steel
Quality Metals
Safeway Sign Company
Metal Supply |
$43,804.00
$46,280.00
$48,800.00
$53,000.00
$58,000.00
See Bid Eval |
| |
|
|
|
|
Ninos Parkway Phase 1B (B083431013)
(14 Bids Received) |
Ricky Chuck |
02-20-2008 |
Gold Valley Const.
Land Mosaics Inc.
Solo Landscaping
Wayne Reed Const.
All Phase Const. |
$124,179.70
$127,009.00
$128,539.50
$129,891.00
$140,099.50 |
| |
|
|
|
|
West El Camino Ave Bridge Replacement over Natomas East Main Drainage Canal (B083431014)
(8 Bids Received) |
Ricky Chuck |
02-20-2008 |
CC Myers
Viking Const.
MCM Const.
Shasta Const.
FCI Const. |
$4,937,777.00
$4,996,880.00
$5,040,326.00
$5,136,724.70
$5,310,653.03 |
| |
|
|
|
|
Varian CP-3800 GC Upgrade (B083327014)
(1 Bids Received) |
Roland Pang |
02-20-2008 |
Varian Inc. |
$33,802.89 |
| |
|
|
|
|
Used Vehicle Brokerage and Sales (B081181046)
(1 Bid Received) |
Marc Robles |
02-20-2008 |
Hansel Ford |
$330,233.75 |
| |
|
|
|
|
City Street and Parks Tree Inventory (P081312005)
(7Proposals Received) |
Patty McGeary |
02-20-2008 |
Arbor pro
Davey Resource Grp
Frayji Design Grp, Inc
Sacramento Tree Foundation
North Coast Resource Management
PBSJ
West Coast Arborist |
|
| |
|
|
|
|
Autosampler for a GC/MS (B083327013)
(2 Proposals Received) |
Roland Pang |
02-20-2008 |
EST Analytical
Varian Inc. |
$13,398.71
$20,597.13 |
| |
|
|
|
|
Warren Park Irrigation Improvements (IR82) (B084727018)
(6 Bids Received) |
Steven Giguere |
02-13-2008 |
JM Slover Inc.
Baker Landscape
David Eng. Const.
Benchmark General Eng.
Emert Const. |
$54,290.00
$55,800.00
$62,875.00
$66,800.00
$66,937.00 |
| |
|
|
|
|
Front Loading Refuse Trucks (B081181054)
(3 Bids Received) |
Marc Robles |
02-13-2008 |
Western Truck Parts
Riverview Int'l Trucks
Sacramento Truck Center |
$415,013.11
$422,457.02
$427,894.00 |
| |
|
|
|
|
Cable & Strength Fitness Equipment - REVISED (B082157023)
(2 Bids Received) |
John Hansen |
02-11-2008 |
LifeFitness
Out Fit |
$41,405.68
$41,810.00
See Bid Eval |
| |
|
|
|
|
Cardio Fitness Equipment - REVISED (B082157024)
(2 Bids Received) |
John Hansen |
02-11-2008 |
Out Fit
LifeFitness
|
$32,931.00
$41,288.00
See Bid Eval |
| |
|
|
|
|
Drain Inlet Replacement - 2008 (XN42) (B083331015)
(16 Bids Received) |
Sonia Lopez |
02-06-2008 |
Florez Paving
Navajo Pipelines
Hudson Excavation
D.A.Wood Constr. Inc.
North Star Constr. |
$298,602.00
$366,952.50
$413,915.00
$445,800.00
$517,960.00 |
| |
|
|
|
|
Ninos Parkway Phase IC (HC61) (B083431012)
(22 Bids Received) |
Ricky Chuck |
02-06-2008 |
All Phase Construction
P.B.M. Construction
Cen. Val. Eng. & Asphalt
Granite Const. Co.
Biundo Land. Const.
|
$186,480.00
$196,196.00
$196,539.00
$198,465.00
$198,790.00 |
| |
|
|
|
|
FWTP Low Lift Pumps Phase II Rebid (ZL71) (B083331017)
(5 Bids Received) |
Jian Zhuang |
02-06-2008 |
Johnson Mechanical Co.
JR Sharp Const. Inc.
BRC Construction
Clayburn Cont. Grp.
Interstate Construction
|
$253,808.00
$262,000.00
$265,500.00
$299,341.00
$309,099.00
|
| |
|
|
|
|
Collapsing/Demolition of Immediately Dangerous Building Services (B081181052)
(6 Bids Received) |
Rochelle Freyman |
02-06-2008 |
DoubleD Demolition, Inc.
Adv. Demo. and Eng.
NICA PMI, Inc.
Parc Specialty Cont.
Delta Oilfield Svcs, Inc.
|
$450.00/525.00
$480.00/657.00
$585.00/650.00
$621.00/931.00
$650.00/954.00
All Bids Rejected |
| |
|
|
|
|
On-Call Building Securement Services (B081181051)
(6 Bids Received)
|
Rochelle Freyman |
02-06-2008 |
Capitol Reconstruction
BLine Construction
SVA Construction
Gray Const. & Sec.
B&S All Phase Const. |
$455/416/613.50
$589/392/597
$685/325/525
$608/475/650
$710/337.50/448
All Bids Rejected |
| |
|
|
|
|
Transient Occupancy Tax Analysis and Forecastig Service Contract (R084326002)
|
Tina McCarty |
02-01-2008 |
PFK
Scott Hospitalities
Strategic Advisory Group |
|
| |
|
|
|
|
Cured-In-Place-Pipe Rehabilitation (XI91) (B083331016)
(3 Bids Received) |
Dale Mathison |
01-30-2008 |
Michels Corporation
Insituform Technologies
JF Pacific Liners, Inc. |
$545,979.00
$571,102.00
$613,685.00
See Bid Eval |
| |
|
|
|
|
Trash and Debris Abatement Services (B081181050)
(6 Bids Received) |
Dennis Kubo |
01-30-2008 |
IMS
Tru Green Landscape
FP Construction
B-Line Construction
Zero Waste Solutions |
$228.00/344.00
$405.00/810.00
$480.00/960.00
$544.00/877.00
$540.00/1,280.00
All Bids Rejected |
| |
|
|
|
|
Morrison Creek Letter of Map Revision (P083351012)
(... Proposals Received) |
Connie Perkins |
01-29-2008 |
Not Yet Available |
|
| |
|
|
|
|
Water Meter Verification Audit/Inventory (Q083341011)
(... Qualifications Received) |
Michael Malone |
01-25-2008 |
Not Yet Available |
|
| |
|
|
|
|
Reconstruction of Sumps 79, 134, 135, 136 (XI86) (B083331012)
(6 Bids Received)
|
Stu Williams |
01-23-2008 |
BRC Construction
Berkely Eng.
JR Sharp Const.
Sierra National Const.
Clyde G Steagall, Inc. |
$882,000.00
$888,887.00
$989,834.00
$1,022,000.00
$1,044,794.00 |
| |
|
|
|
|
Ornamental Street Light Assemblies (B081181047)
(4 Bids Received) |
John Matoba |
01-23-2008 |
Hi-Line Electric Co.
Graybar
South Bay Foundry, Inc.
Wesco |
$803,980.00
$809,484.80
$820,367.93
$826,040.00
See Bid Eval |
| |
|
|
|
|
Transportation Development Impact Fee Program (P083431006)
(... Proposals Received) |
Azadeh Doherty |
01-18-2008 |
Not Yet Available |
|
| |
|
|
|
|
Florin Rd Median Landscaping Phase II (B083431011)
(13 Bids Received) |
Faramarz Ansari |
01-16-2008 |
Central Pacific Const.
Parker Landscape
Odyssey Companies
JM Slover, Inc.
Heminton Landscape |
$291,967.45
$373,664.42
$447,600.00
$454,633.70
$492,996.00 |
| |
|
|
|
|
Army Depot Barracks Demolition
(B083275014)
(....Bids Received) |
Gary Holm |
01-11-2008 |
Not Yet Available |
|
| |
|
|
|
|
| Department User Fee (P08114000) (3 Proposals Received) |
Scott Pettingell |
01-11-2008 |
Rancho Cordova Independent Diesel Repair
Holt of California
Peterson Power |
$68,886.80
$97,923.00
$123,142.00 < |