Divisions, Text Version of Menus  
Director's Office & Business Services  
Planning and Policy  
Engineering Services  
Parking Services  
Street Services  
Traffic Engineering Services  
Urban Forest  
Related Site Links  
Contact Us  
Sitemap  
Home Page  

 

Engineering Services
Publications


   
 

Fiscal Year 2008-09 Annual Report and 2010 Calendar

Click on the upper or lower left and right hand corners to turn the pages and use the toolbar with brown buttons at top to zoom in or out.


Fiscal Year 2007-08 Annual Report

Download 2007-08 Annual Report PDF


General specifications and provisions for
providing landscape maintenance services

View document (PDF)


Department of Transportation 2008-09 Business Plan

View report (PDF)


Sacramento Transportation and Air Quality
Collaborative: Sharing the results

View report


 

How to obtain streetlights for your neighborhood

View brochure (PDF)


Project Delivery Manual

View report


Cosumnes River Boulevard Extension and I-5 Interchange Final Environmental Impact Statement/Environmental Impact Report .

View report


Cosumnes River Boulevard Extension and I-5 Interchange Revised Draft Environmental Impact Report (EIR)/Environmental Impact Statement (EIS)

View the revised draft report as Word/PDF.


Pedestrian Master Plan approved by City Council, July 25, 2006

Pedestrian Master Plan (PDF 16.7MB)

Pedestrian Master Plan Appendices (PDF 9MB)


Cosumnes River Boulevard Extension and Interchange at I-5

View the report as a PDF.

View the report as a Word document.


Central City Two-Way Conversion Study

The City released on August 23, 2006, a final Environmental Impact Report on the Central City Two-Way Conversion Study. The study will be presented to the City Council on Tuesday, March 20, 2007 at its 7 p.m. meeting.

Environmental Impact Report - Full Report - PDF (18.9 MB)

 


Central City Two-Way Conversion Study

The City released on January 13, 2006, a draft Environmental Impact Report on the Central City Two-Way Conversion Study for a 45-day public review period.

View the Conversion Options Approved for Environmental Review (May 2003)

 


Design and Procedures Manual

The following are publications via Traffic Engineering Services. If you have any troubles opening any of the following publications, right-click (PC) or Ctrl-click (Mac) and choose "Save Target As..." (PC) or "Download Link To Disk" (Mac). Save the file to your desktop and open it from there.

Section 14

Section 15

Section 17

Department of Utilities


Transportation Programming Guide

View the Transportation and Programming Guide presentation and displays.


City Truck Routes (108 KB)

Speed Hump Program Guidelines (73 KB)

Pedestrian Friendly Street Standards (1.19 MB)

California State Auditor/Bureau of State Audits July 2002 Red Light Camera Audit (15 KB)

City-wide maps of all amendments including close-up maps of the developing areas (1.8 MB)

City-wide map of all amendments without close-up maps (1.0 MB)

Natomas area amendments only (373 KB)

South Sacramento amendments only (249 KB)

Southeast Sacramento amendments only (207 KB)

Azevedo Drive Master Plan Exhibits (1.39 MB)

Pedestrian Safety Guidelines (2.78 MB)

Traffic Calming Guidelines (4.43 MB)

Southeast Area Transportation Study (5.59 MB)

Transportation Programming Guide ( 7.23 MB)

Get Adobe Acrobat Readerto use the PDF files

 

 

 

 

 

 

 









Department of Transportation - City of Sacramento | Moving forward together