Accessibility mode is enabled

Skip to Top / Tab to View Menu Options
Skip to Left Navigation / Tab to View Content

Roosevelt Park (Franklin d.)

1615 9th Street, Sacramento, CA 95814

Roosevelt Park Restroom Renovation
Construction is schedule to start September 2019 and end December 2019. Improvements include: renovating the existing restroom and converting them from men’s and women’s restrooms into two multigender restrooms, replacement of all the fixtures, new lighting, removal of some walls and replacement of the surrounding walkway.
Project Manager: Jeff Nittka, jnittka@cityofsacramento.org

Roosevelt Park Ballfield Improvements
Construction is scheduled to start mid -September 2019 and end February 2020. Improvements include: expansion and topdressing of baseball infield, irrigation and turf modifications, replacement of ball field backstop, overthrow fencing, maintenance and pedestrian gates, replacement of concrete flatwork, four players benches, two bleachers, a scorer’s table, and new bases, perimeter landscape improvements (irrigation modifications, soil preparation landscape planting, irrigation audit, and bark mulch) with a 90-day plant establishment period.
Project Manager: Dennis Day, dday@cityofsacramento.org

Roosevelt Park Fitness Court (PDF)

Roosevelt Park Future Fitness Court

This park includes the following amenities:

  • Picnic Areas 2
  • Softball Field - 1 lighted
  • Restroom Open 24/7

Meeting Flyer:

MapQuest Link

Park Use Application

Park Use Guide

Athletic Field Use Application

Athletic Field Use Guide