Airfield Park

2485 Natomas Crossing Drive

Airfield Park Master plan Phasing 2019

Airfield Park Master Plan Phasing 2019 (PDF)

This 9.47 acre community park site is undeveloped. It was master planned and the first phase is scheduled to begin constructed grading, drainage, concrete walkways, irrigation, landscaping, tree planting, multi-purpose turf areas, central plaza, children's playgrounds, group picnic area with a shade structure, corn-hole games and ping pong tables and site furniture. The playground shade canopies, multi-purpose court and 2nd group picnic shelter will be bid as additive alternates and built if additional funding is available.

This park site has 9.12 undeveloped acres. It was master planned and the first phase is scheduled to be constructed winter 2019/spring 2020.